A satellite mission from design review to launch and commissioning in orbit.
Drawing diagramβ¦
Gantt chart of a small satellite mission: preliminary and critical design reviews, subsystem manufacturing, assembly, integration and test (vibration, thermal vacuum), shipping and launch vehicle integration, launch, and in-orbit commissioning before operations.
gantt title Small Satellite Mission Timeline dateFormat YYYY-MM-DD section Design Preliminary design review :a1, 2026-01-01, 60d Critical design review :a2, after a1, 90d section Build Subsystem manufacturing :b1, after a2, 180d Assembly and integration :b2, after b1, 60d section Test Vibration test :c1, after b2, 20d Thermal vacuum test :c2, after c1, 25d section Launch Ship and integrate with launcher :d1, after c2, 30d Launch :milestone, d2, after d1, 0d section Operations In-orbit commissioning :e1, after d1, 45d Mission operations :e2, after e1, 365d
How an earth-observation satellite operator talks to its satellites: ground stations around the world, the mission control centre and the data processing centre.
The phases of a rocket launch from countdown to payload separation, with holds, aborts and the flight termination path.
How an aircraft is built from a global supply chain: tier suppliers, major assemblies, final assembly, testing and delivery.
How telemetry from a spacecraft is received, decoded, checked against limits and archived, and how commands go back up.
The ground software for operating a satellite constellation: mission planning, flight dynamics, contact scheduling, command and control, and payload delivery.
A schema for aircraft maintenance: aircraft, installed components with life limits, maintenance tasks, work packages and parts inventory.