Aircraft engineering change workflow: an engineering change request (ECR) is raised. Engineering assesses impact on safety, weight, cost and certification and classifies it as minor or major. Major changes need approval from the airworthiness authority (DGCA/EASA/FAA). Approved changes are released as engineering orders, drawings are updated in PLM, production and suppliers implement them, and affected aircraft serial numbers are tracked.
flowchart TD
A[Raise engineering change request] --> B[Impact assessment: safety, weight, cost]
B --> C{Classification}
C -->|Minor| D[Internal design approval]
C -->|Major| E[Submit to airworthiness authority]
E --> F{Authority approves?}
F -->|No| G[Revise design] --> B
F -->|Yes| D
D --> H[Release engineering order]
H --> I[Update drawings in PLM]
I --> J[Notify production and suppliers]
J --> K[Implement on affected serial numbers]
K --> L[Close change with records]How an earth-observation satellite operator talks to its satellites: ground stations around the world, the mission control centre and the data processing centre.
The phases of a rocket launch from countdown to payload separation, with holds, aborts and the flight termination path.
How an aircraft is built from a global supply chain: tier suppliers, major assemblies, final assembly, testing and delivery.
How telemetry from a spacecraft is received, decoded, checked against limits and archived, and how commands go back up.
The ground software for operating a satellite constellation: mission planning, flight dynamics, contact scheduling, command and control, and payload delivery.
A schema for aircraft maintenance: aircraft, installed components with life limits, maintenance tasks, work packages and parts inventory.