⛏️ Mining, Metals & Chemicals · Gantt
A multi-year plan for closing a mine responsibly: final production, decommissioning, landform shaping, revegetation and monitoring before handover.
Drawing diagram…
Gantt chart for mine closure: progressive reclamation during the last production years, final production, decommissioning of plant and buildings, landform shaping of waste dumps, topsoil spreading, revegetation over three monsoons, pit lake and water quality monitoring, community transition programmes and final handover.
gantt title Mine Closure and Reclamation dateFormat YYYY-MM-DD axisFormat %Y section Production end Progressive reclamation :a1, 2027-01-01, 730d Final production :a2, 2028-01-01, 365d section Decommissioning Dismantle plant :b1, after a2, 240d Remove buildings :b2, after b1, 120d section Land Reshape waste dumps :c1, after a2, 300d Spread topsoil :c2, after c1, 120d Revegetation 3 monsoons :c3, after c2, 900d section Monitoring Water quality monitoring :d1, after a2, 1460d Community transition :d2, after a2, 730d Final handover :milestone, d3, after c3, 0d
A fleet management system for an open-pit mine: dump trucks and shovels report position and payload, a dispatch engine assigns loads, and a control room watches production live.
The states of a mining haul truck in each load-and-dump cycle, used by dispatch systems to measure productivity and waiting time.
How an underground mine keeps people connected and safe: leaky feeder radio, Wi-Fi, gas sensors and personnel tracking tags, linked to the surface control room.
How mined ore becomes finished metal in an iron and steel chain, in thousand tonnes per month, showing where material is lost.
Where the control systems of a metal smelter run: field instruments, PLCs and a DCS in the plant, a historian, and a separate business network behind a demilitarised zone.
Tables that trace a chemical product batch back to its raw material lots, process steps, quality tests and customer shipments, for recalls and audits.