🏭 Manufacturing · Gantt
A high-level schedule for setting up a new manufacturing line: site work, equipment, installation, trials and ramp-up.
Drawing diagram…
Gantt chart for a new production line: land and approvals, civil construction, utilities (power, compressed air), equipment ordering with long lead times, installation and commissioning, MES and IT setup, operator training, trial runs and customer validation (PPAP), and staged ramp-up to full production.
gantt title New Production Line Setup dateFormat YYYY-MM-DD axisFormat %b %y section Site Approvals and permits :a1, 2026-10-01, 45d Civil construction :a2, after a1, 90d Utilities - power and air :a3, after a2, 30d section Equipment Order long-lead machines :b1, 2026-10-15, 120d Installation :b2, after a3, 30d Commissioning :b3, after b2, 20d section Systems and people MES and IT setup :c1, after a2, 45d Operator training :c2, after b2, 30d section Launch Trial runs :d1, after b3, 20d Customer validation (PPAP) :d2, after d1, 30d Ramp-up to full volume :d3, after d2, 45d
The states a production order goes through on the shop floor, from release by planning to closure, including material shortages, rework and scrap.
An incoming and in-process quality inspection flow: sampling, measurement against the spec, and what happens to a batch that fails.
A connected factory: machines and sensors on the shop floor, an edge layer, MES and ERP, and cloud analytics for OEE and predictive maintenance.
How production orders flow from ERP planning to the shop floor MES and how confirmations, goods movements and scrap flow back.
How vibration and temperature data from machines becomes a maintenance work order before the machine fails.
How materials flow from suppliers to customers in a manufacturing business: purchasing, inbound quality, production, warehousing and distribution.